Block paving Method Statement

A construction worker wearing a weathered high-visibility yellow safety vest and white hard hat and gloves and knee protectors  fitting block paving

This method statement for block paving is available as an instant download.

At the top of the first page, you can enter your company name and project details, and at the bottom, you can sign, print, and date it.

It couldn’t be easier. Once you’ve entered your details, you’re good to go.

You can customise the document to your company and needs by inserting your company name, logo, contract details, site address, etc.

The method statement becomes part of your branded H&S package.

Block paving is an advanced construction technique that entails the meticulous installation of individual concrete or clay bricks to create a robust and visually appealing hardstanding area. In contrast to traditional materials such as poured concrete, asphalt, or stone slabs, block paving offers a significant degree of customization and design flexibility. The individual blocks can be arranged in a myriad of intricate patterns, enabling homeowners and landscape designers to achieve a unique aesthetic that enhances the outdoor environment while also fulfilling practical needs such as effective drainage and ease of maintenance.

Moreover, the design of raised, interlocking blocks forms a resilient surface capable of withstanding considerable weight and vehicular traffic. This construction method not only substantially extends the lifespan of driveways, patios, and walkways but also facilitates quick and straightforward repairs; if a block becomes worn, cracked, or otherwise damaged, it can frequently be replaced individually, minimising disruption and reducing the need for extensive repair work on surrounding blocks. Additionally, the extensive range of colours, shapes, sizes, and textures available allows homeowners and designers to craft distinctive outdoor spaces that beautifully complement the overall architectural style of the property, enhancing both functionality and curb appeal.

The method statement is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If the method statement needs altering to include an additional task, such as:

          “Ensure you sign and date the site register located in the welfare facilities before commencing work”

It can easily be added as the document comes in Word™, not PDF.


Once you buy and download this document, it’s yours for life to use repeatedly.

We’ve done the hard work for you, allowing you to inspire confidence in your company, products, and services.

The scope of work that this method statement covers includes:

  1. Start of works
  2. Excavate and lay blocks
  3. Finishing

Why not browse the HSEDocs catalogue of method statements, risk assessments, COSHH assessments, or industry-specific packages?
And for safety training relevant to your job, visit our online training courses. 

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant