Brick and block work Method Statement

A construction worker wearing a weathered hard hat, weathered yellow high visibility vest and  gloves building a grey blockwork wall

This method statement for brick and block work is available as an instant download.

At the top of the first page, you can enter your company name and project details, and at the bottom, you can sign, print, and date it.

It couldn’t be easier. Once you’ve entered your details, you’re good to go.

You can customise the document to your company and needs by inserting your company name, logo, contact details, site address, etc.

The method statement becomes part of your branded H&S package.

Brick and blockwork, commonly referred to as cavity wall construction, is a traditional building technique that consists of two distinct layers for wall assembly. The inner layer is usually made of concrete blocks, which contribute to the wall's structural integrity and enhance energy efficiency through improved insulation. The outer layer is typically constructed from fired bricks or finished rendered blocks, serving both aesthetic and protective functions against environmental elements such as moisture and extreme temperatures. This method promotes durability, design versatility, and visual appeal, making it a widely preferred option in contemporary architecture.

The method statement is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If the method statement needs altering to include an additional task, such as:

          “Ensure you sign and date the site register in the welfare facilities before commencing work.”

It can easily be added as the document comes in Word™, not PDF.


Once you buy and download this document, it’s yours for life to use repeatedly.

We’ve done the hard work for you, allowing you to inspire confidence in your company and your products and services.

The scope of work that this method statement covers includes:

  1. Start of works
  2. Setting out
  3. Basic artistry
  4. Finishing 

Why not browse the HSEDocs catalogue of method statements, risk assessments, COSHH assessments, or industry-specific packages?
And for safety training relevant to your job, visit our online training courses. 

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant