Plumbing General Method Statement

A photograph of a plumber fitting a boiler. He wears a faded yellow vest, a lightly worn white hard hat, safety goggles, and a dust mask, and work gloves

This method statement for plumbing installations is available as an instant download.

At the top of the first page, you can enter your company name and project details, and at the bottom, you can sign, print, and date it.

It couldn’t be easier. Once you’ve entered your details, you’re good to go.

You make the document specific to you and your needs by inserting your company name, logo, contract details, site address etc…

The method statement becomes part of your branded H&S package.

The method statement is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If the method statement needs altering to include an additional task, such as:

          “Ensure you sign and date the site register located in the welfare facilities before commencing work”

It can easily be added as the document comes in Word™, not PDF.


Once you buy and download this document, it’s yours for life to use repeatedly.

We’ve done the hard work for you, allowing you to give people confidence in you, your company, your products and services.

The scope of work for this general plumber's method statement has not been written, so it's not specific to a task such as central heating installation or installing sanitary ware. Instead, it focuses on the elements that are used in all aspects of plumbing, including:

  1. Start of works
  2. Storage and transport
  3. Pipe installation
  4. Pipe connections
  5. Gas connection
  6. Fitting accessories, end-user appliances and radiators
  7. Fixing methods for appliances
  8. Finishing

Why not browse the HSEDocs catalogue of method statements, risk assessments, COSHH assessments, or industry-specific packages?
And for safety training relevant to your job, visit our online training courses. 

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant