Power flushing central heating method statement

A  construction worker wears a  worn yellow high-visibility vest, weathered blue hard hat, and thin gloves working on a modern domestic boiler

This method statement is for power flushing a central heating system and is available as an instant download.

At the top of the first page, you can enter your company name and project details, and at the bottom, you can sign, print, and date it.

It couldn’t be easier. Once you’ve entered your details, you’re good to go.

You can customise the document to your company and needs by inserting your company name, logo, contact details, site address, etc.

The method statement becomes part of your branded H&S package.

The method statement is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If the method statement needs altering to include an additional task, such as:

          “Ensure you sign and date the site register in the welfare facilities before commencing work.”

It can easily be added as the document comes in Word™, not PDF.


Once you buy and download this document, it’s yours for life to use repeatedly.

A sample from this method statement reads:

5. Connect the inlet, dump, and overflow hoses. If necessary, connect the flushbuddy to the flow and return valve.
6. Ensure the overflow and dump hose outlets are lower than the dump valve.
7. Turn the iso valves on the flow and return, mains fill and dump to the closed position.
8. Turn on the mains water and fill the flushing machine to the correct operational levels.
9. Open the flow and return valves and run the machine for 15 minutes, reversing the flow every 60 to 90 seconds.
10. Dump the dirty water and refill the reservoir tank as required until the TDS of the dump water is within 20% of incoming mains.
11. Add the recommended power flush cleaner.

Why not browse the HSEDocs catalogue of method statements, risk assessments, COSHH assessments, or industry-specific packages?
And for safety training relevant to your job, visit our online training courses. 

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant