Renew concrete floor Method Statement

A construction worker pouring concrete at dusk. The worker wears a white hard hat, high-visibility yellow safety vest, black t-shirt, and gray rubber boots. He is pouring gray concrete from a wheelbarrow onto a wooden form.

This method statement for laying a concrete floor is available as an instant download.

At the top of the first page, you can enter your company name and project details, and at the bottom, you can sign, print, and date it.

It couldn’t be easier. Once you’ve entered your details, you’re good to go.

You can customise the document to your company and needs by inserting your company name, logo, contact details, site address, etc…

The method statement becomes part of your branded H&S package.

A concrete floor is a versatile flooring option composed of a mixture of cement, water, and aggregates such as sand and gravel. It is well-known for its exceptional durability and low maintenance, making it especially suitable for high-traffic areas such as basements, kitchens, bathrooms, and garages.

Typically, concrete floors are poured as solid slabs over a prepared substrate, often supported by a layer of crushed hardcore or gravel. This design promotes proper drainage and enhances stability, allowing the concrete to withstand heavy use and significant foot traffic without compromising its structural integrity.

One of the primary advantages of concrete flooring is its resistance to stains and moisture. This characteristic makes it less susceptible to damage from spills or humidity, which is particularly beneficial in areas like bathrooms and basements. Additionally, concrete floors require minimal maintenance, typically requiring only regular sweeping or mopping. Unlike many other flooring materials, concrete does not require sealing or waxing, making it an attractive option for both residential and commercial settings.

The aesthetic flexibility of concrete is another significant benefit. It can be left in its natural, raw state to create a rugged industrial look or polished for a smooth, contemporary finish that beautifully reflects light. Furthermore, concrete can be stained or textured in various ways, allowing homeowners and designers to achieve diverse visual effects and styles that complement different decors.

The method statement is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If the method statement needs altering to include an additional task, such as:

          “Ensure you sign and date the site register located in the welfare facilities before commencing work”

It can easily be added as the document comes in Word™, not PDF.


Once you buy and download this document, it’s yours for life to use repeatedly.

We’ve done the hard work for you, allowing you to inspire confidence in your company and your products and services.

The scope of work that this method statement covers includes:

  1. Start of works
  2. Renew floor
  3. Finishing 

Why not browse the HSEDocs catalogue of method statements, risk assessments, COSHH assessments, or industry-specific packages?
And for safety training relevant to your job, visit our online training courses. 

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant